location-icon 19/5s, 5th Neighborhood, district 2, 5th Settlement, New Cairo, Cairo, EGYPT
egypt-flag
-flag
france-flag
germany-flag
italy-flag
facebook icon twitter-icon linkedin-in-icon
  • Home(current)
  • About
    Company Profile team Projects Videos Certificates
  • Videos
  • Projects
    Wastewater Treatment Plants Drinking Water Treatment Plants Sewage Pumping Stations Irrigation Water Pumping Stations Potable Water Pumping Stations
  • clients
  • factory
    Scope of Works Factory Certificates Factory Gallery Previous Experience
  • contact us
    Main Office FP Factory

Wastewater Treatment Plants

Extension of Damanhour STP From 90,000 to 16,000 CMD

2008-03-10 : 13/04/2011
budget : 29000000 EGP

The domestic Sewage is collected from the area through a gravitational network and then pumped through the main pumping station which pumps the flow to the treatment plant.
The treatment works are based on the activated sludge process.

The contract comprises the supply and erection, testing and handing over in perfect working condition the mechanical and electrical equipment for Damanhour Sewage Treatment Works. 
The contract also includes the supervision of maintenance and guarantee for a period of one year of the whole work covered by the contract.
 

The parts of the treatment plant which consists mainly of the following steps: 

1. Inlet and quieting chamber.

2. Mechanical and manual Screening (Available from the first stage):

  • Manual coarse screens.
  • Mechanical screens, coarse and fine, with rakes.
  • Gates.

3. Aerated grit chambers (Available from the first stage):

  • Grit scraper.
  • Submersible sand pumps.
  • Grit elevator tanks.
  • Separation system.
  • Air blower.

4. Primary Settling Tanks:

  • Scrapers.
  • Electrical equipment.

5. Aeration Tanks:

  • Surface aerators.
  • Electrical equipment.

6. Final Settling Tanks:

  • Scrapers.
  • Electrical equipment.

7. Return sludge pumping station:

  • Screw pumping units to return the sludge from final sedimentation tanks to the rna1n aeration tanks
  • Electrical equipment

8. excess sludge pumping station:

  • Submersible pumping units to lift the excess sludge to the primary sedimentation tanks distribution chamber
  • Electrical equipment.

9. Sludge Pumping Stations:

  • Sludge pumping units of vertical close-coupled type dry installed, to pump primary sludge from primary sedimentation tanks to the thickeners, complete with pipes, valves and accessories (Available from the first stage).
  • Sludge pumping units of vertical close-coupled type to pump the thickened sludge to drying beds (3 units are available from the first stage and only one pump is supplied under this stage).
  • Supernatant pumping units of the submersible type installed to pump supernatant liquid to the quietening chamber, complete with pipes, valves and accessories.

10. Sludge Thickeners:

  • Racking and scraping mechanism.
  • Electrical equipment.

11. Effluent Chlorination(Avai/ab/e from first stage):

  • Chlorinator.
  • Piping System.
  • Control Unit.

12. Piping and gates.
 

Fine peak is the premier constructor of water and wastewater treatment facilities and utilities. our employees have constructed virtually every type of treatment plant facility.

facebook-icon
twitter-icon
linked-in-icon

Main Pages

  • Home
  • Videos
  • clients
  • contact us

Quick Access

  • Company Profile
  • Team
  • Factory Introduction
  • Previous Experience
  • Certificates

Address Location

19/5s, 5th Neighborhood, district 2, 5th Settlement, New Cairo, Cairo, EGYPT

P.Code: 11835

Phone : +202 25648451 /2 /3

Fax : +202 25648454

Email : info@finepeak.com

Copyright Reserved. FinePeak 2019

  • Terms of use
  • Privacy
  • FAQ