location-icon 19/5s, 5th Neighborhood, district 2, 5th Settlement, New Cairo, Cairo, EGYPT
egypt-flag
-flag
france-flag
germany-flag
italy-flag
facebook icon twitter-icon linkedin-in-icon
  • Home(current)
  • About
    Company Profile team Projects Videos Certificates
  • Videos
  • Projects
    Wastewater Treatment Plants Drinking Water Treatment Plants Sewage Pumping Stations Irrigation Water Pumping Stations Potable Water Pumping Stations
  • clients
  • factory
    Scope of Works Factory Certificates Factory Gallery Previous Experience
  • contact us
    Main Office FP Factory

Wastewater Treatment Plants

Mansoura STP - 45,000 m³/day

2007-06-24 : Mar, 2009
budget : 13200000 EGP

All Mechanical & Electrical works:

- Inlet chamber:

  • 4 Mechanical raked screens with belt conveyor

  • Emergency Screen

- Two Primary settling tanks 41m dia.:

  • 2 Scraper bridges 43m length with driving equipment

- Four rectangular biological aeration tanks:

  • 12 Vertical surface aerator 55 kW

  • 4 Vertical surface aerator 110 kW

  • 2 Adjustable outlet/overfall weir

- Three final settling tanks 40m dia.:

  • 3 Scraper bridges 42m length with driving equipment

Fine peak is the premier constructor of water and wastewater treatment facilities and utilities. our employees have constructed virtually every type of treatment plant facility.

facebook-icon
twitter-icon
linked-in-icon

Main Pages

  • Home
  • Videos
  • clients
  • contact us

Quick Access

  • Company Profile
  • Team
  • Factory Introduction
  • Previous Experience
  • Certificates

Address Location

19/5s, 5th Neighborhood, district 2, 5th Settlement, New Cairo, Cairo, EGYPT

P.Code: 11835

Phone : +202 25648451 /2 /3

Fax : +202 25648454

Email : info@finepeak.com

Copyright Reserved. FinePeak 2019

  • Terms of use
  • Privacy
  • FAQ