location-icon 19/5s, 5th Neighborhood, district 2, 5th Settlement, New Cairo, Cairo, EGYPT
egypt-flag
-flag
france-flag
germany-flag
italy-flag
facebook icon twitter-icon linkedin-in-icon
  • Home(current)
  • About
    Company Profile team Projects Videos Certificates
  • Videos
  • Projects
    Wastewater Treatment Plants Drinking Water Treatment Plants Sewage Pumping Stations Irrigation Water Pumping Stations Potable Water Pumping Stations
  • clients
  • factory
    Scope of Works Factory Certificates Factory Gallery Previous Experience
  • contact us
    Main Office FP Factory

Drinking Water Treatment Plants

Design & Build of Kafr El-Elou Water Treatment Plant 400,000 CMD

2008-02-14 : In Progress
budget : 169105600 EGP

The Plant had been constructed in 1921 on about 25,200 m² in Helwan Governorate and was designed for max. the capacity of 80,000 m3/day. The plant depends on the Nile River to provide the potable water to Helwan & Kafr El-Elou regions. During this long period, many enhancements had been done but because of the oldness of the plant, the capacity reduced to be 68,000 m3/day.  For all the previous & the importance of the plant, this project has born.  The scope of works for this project includes an extension of the facilities and equipment to increase the capacity to be 400,000 m3/day.

Scope of Work:

Design & Engineering.

Supply & Erection of the Mechanical & Electrical Equipment as follows:

  1. Inlet Chamber:
    • 3 Mechanical band screens
    • 2 belt conveyors (horizontal & inclined)
  2. Raw water pumping station building:
    • 12 Raw water pumps:

Q = 2,304 m³/h

H = 19 m

P = 134 kW

      • 12 DN800 Butterfly valves, PN10
      • 12 DN600 Butterfly electrical valves, PN10
      • 12 DN600 non-return valves, PN10
      • Submersible dewatering pump 30m³/h@12m
      • DN100 butterfly valve, PN10
      • DN100 non-return valve, PN10
      • 14 Isolating penstocks
      • Double girder travelling crane 5 tons
  1. Clarifiers:
  • 8 Clarifiers 17.5m x 31.5 each
  • 8 Flash mixers
  • 16 Agitators for flocculation zone
  • Lamellas for lamella clarifier
  • 16 Sludge recirculation pumps 122m³/h@6m
  • 8 Excess sludge pumps 60m³/h@20m
  • 12 Isolating penstocks
  1. Filters:
  • 20 Filters 8x16m each
  • 28 Isolating penstocks
  • 92 valves DN150 – DN800
  • 4 Adjustable straight overflow weir
  • 6 Backwash water pumps:

Q = 1,600 m³/h

H = 10 m

P = 56 kW

  1.  

5. Treated water pumping station building:

  • Pressure boosting pump:

Q = 250 m³/h

H = 50 m

P = 18.5 kW

      • 12 Treated water pumps 2088m³/h@100m 651kW

      • Double girder travelling crane 10 tons

      • Submersible dewatering pump 40m³/h@15m

 

  • Operation & Maintenance for one year

Fine peak is the premier constructor of water and wastewater treatment facilities and utilities. our employees have constructed virtually every type of treatment plant facility.

facebook-icon
twitter-icon
linked-in-icon

Main Pages

  • Home
  • Videos
  • clients
  • contact us

Quick Access

  • Company Profile
  • Team
  • Factory Introduction
  • Previous Experience
  • Certificates

Address Location

19/5s, 5th Neighborhood, district 2, 5th Settlement, New Cairo, Cairo, EGYPT

P.Code: 11835

Phone : +202 25648451 /2 /3

Fax : +202 25648454

Email : info@finepeak.com

Copyright Reserved. FinePeak 2019

  • Terms of use
  • Privacy
  • FAQ